Detached Cast Iron Enamelled Sauce Pan With Lid
- Type:
-
Cookware Sets
- Material:
-
Metal
- Metal Type:
-
Cast Iron
- Certification:
-
CE / EU, FDA, LFGB, SGS
- Feature:
-
Eco-Friendly
- Place of Origin:
-
Hebei, China (Mainland)
- Brand Name:
-
Amy
- Model Number:
-
Mt-pot
- Description:
-
Saucepot
- 500 Set/Sets per Day
- Packaging Details
- Color Box
- Port
- Xingang
- Lead Time :
- 30days
SPECIFICATION
Description | Detached Cast Iron Enamelled Sauce Pan With Bkelite Knob |
Coating | Color Enamel Coating |
Weight | 1.8Kg/2.2kg/3.0Kg |
Product Size |
L.34.5xDia.15.5xH(wihout lid).7.7cm; L.37xDia.17.5xH(wihout lid).8.5cm; L.38.5xDia.19xH(wihout lid).9.5cm; |
Packing Quanlity | 4Pcs |
Gross Weight | 8.7Kgs/10.3Kgs/13.5Kgs |
PRODUCT DETAILS
Cast iron cookware guide:
1.when cooking on the stove top, select the burner size that best match the diameter of the cookware bottom. never use a heating element larger that the cookware bottom. Do not let flames extend over another burner or over the edge of the range.
2.High heat is not recommended. your cast iron cookware efficiently distributes and maintains heat. Select only low to medium heat for best result.
3.always use hot pads or kitchen gloves when removing cookware from the oven or stove top. do not sue this cookware in a microwave oven.
4.use only plastic heat resistant nylon or wooden tools, this will help avoid any scratching or marring of the surface.
5.Before cooking, apply vegetable oil to the cooking surface of your pan and pre-heat the pan slowly (always start on low heat, increasing the temperature slowly).
Once the pan is properly pre-heated, you are ready to cook.
PACKING & DELIVERY
Color box
Packing:per piece packed in one inner carton, every 4 pieces packed in one outer carton, packing according to customer’s requirement
EXHIBITION
WHY US
1. How long has the company been established?
Shijiazhuang Amy Import & Export Co., Ltd was established in 2008. We have very rich experience on exporting.
2. What is your main scope of business?
We mainly manufacture and export cast iron cookware and stone motar & pestle.
3. How long does it take to receive goods?
Sample: within 7-14 days
Mass production: delivery time is about 30 days after receiving deposit and all design confirmed
4. What are the payment terms?
T/T 30% deposit and the balance against the copy of B/L or L/C at sight
5. Can we visit the factory?
Yes, our factory is near our city, trafic developed, it is very convenient for your visiting.